Frameless Servo Motor Kits - RFQ Validation Checklist 1) Confirm OD/ID/stack boundary and mounting datum revision. 2) Confirm continuous and peak torque-speed targets at actual bus voltage. 3) Confirm cable exit direction and connector constraints in CAD review. 4) Confirm thermal boundary: ambient, duty cycle, allowable rise. 5) Confirm sample acceptance criteria and lot traceability requirement.